NASA planned Apollo 9's Earth-orbit mission as the first crewed test of the lunar module. Its planned spacewalk would test the spacesuit and portable life-support system and demonstrate a way to transfer crew outside the spacecraft if the internal tunnel or hatches presented a problem. The contingency puts a human obligation alongside the technical objective: prepare for the people who must use the system when something goes wrong. [S1]
Responsibility extended to the return journey. NASA designed the 83,000-square-foot Lunar Receiving Laboratory to isolate returning astronauts, their spacecraft and lunar samples while keeping the samples as pristine as possible. A mobile quarantine facility was intended to isolate the astronauts from shortly after splashdown until their arrival at the laboratory, a precaution against possible lunar microorganisms reaching Earth's environment. [S1]
On February 6, 1969, workers placed the mobile facility in a vacuum chamber to test its emergency oxygen supply under simulated aircraft pressure loss. Three test subjects successfully completed the test, NASA reported. The exercise linked care for the people inside the facility with the wider precaution the facility was designed to serve. [S1]
Source documents
- 55 Years Ago: Five Months Until the Moon Landinghttps://www.nasa.gov/history/55-years-ago-five-months-until-the-moon-landing/
